Sabah 120 MW Power Plant

Sabah 120 MW Power Plant

IN ENERGY
portfolio
Investor Name:
Published Date:
January 1, 1970
Location:
Value:
Architecture:
About Project

The Project (which was a simple/open cycle facility, 2 Gas Turbines X 60 MW, using natural gas as the primary fuel and No. 2 distillate as the secondary fuel).

LOCATION    : Malaysia

SERVICE          :  Construction Management

VALUE               :  Confidential

SIZE                    :  120 MW

CLIENT             :  Tenaga National Berhad

TYPE                  :  Energy

OVERVIEW

Kingston was responsible for the delivery of the 120 MW IndependentPower Plant (Sabah IPP) in East Malaysia. The Project (which was a simple/open cycle facility, 2 Gas Turbines X 60 MW, using natural gas asthe primary fuel and No. 2 distillate as the secondary fuel) was carried out by a joint venture with Kentz International and General Electric Asia.